Health and Safety Policy Arrangements

H&S Legislation and HSE Information

The following HSE Equipment and Method Sheets provide definitive practical advice about working in an environment in which asbestos exists.

  • em0: Risk assessments and plans of work (PDF)
  • em1: What to do if you discover or accidentally disturb asbestos during your work (PDF)
  • em2: Information, instruction and training (PDF)
  • em3: Building and dismantling a mini-enclosure (PDF)
  • em4: Using a class-H vacuum cleaner for asbestos (PDF)
  • em5: Wetting asbestos materials (PDF)
  • em6: Personal protective equipment, including RPE (PDF)
  • em7: Using damp rags to clean surfaces of minor asbestos contamination (PDF)
  • em8: Personal decontamination (PDF)
  • em9: Disposal of asbestos waste (PDF)
  • em10: Statement of cleanliness after textured coating removal (PDF)

Marisco Group

Head Office:
Unit J5, The Fulcrum
Vantage Way, Poole, BH12 4NU

Tel: 01202 474001

Email: accounts@mariscosouth.com

Marisco South Ltd is registered with: